The Temples Moved to Higher Ground
Written by Studio AM.
Your result
- Words per minute
- Score
- Pace
Words per minute mean something only with the score beside them. They describe this passage on this read. With fewer than 3 right, try the next slower pace.
Choose a pace and select Start. The passage is paced and timed, then the questions check what you understood. How pace mode works
Reading time 0:00
In the 1960s, a new dam on the Nile threatened the ancient temples at Abu Simbel in Egypt. The planned reservoir would cover their original site with water. The reservoir also forced many Nubian families to leave towns and villages that the rising water would submerge.
Egypt and Sudan asked for international help. Engineers and workers cut the temples into more than one thousand stone blocks. The largest blocks weighed about thirty metric tons. Each piece was marked so it could return to the correct position.
The team rebuilt the temples on higher ground, about sixty-five meters above the old site and farther inland. An artificial hill helped reproduce the original setting. The work was completed in 1968.
The rescue combined archaeology, engineering, funding, and cooperation across countries. The rebuilt site preserved the great carved figures and interior spaces while the reservoir formed below. The project showed how international teams could work together to protect threatened monuments.
The passage is hidden while you answer. It comes back with your result.
Questions
Choose an answer. The explanation appears after you answer.
-
Question 1 of 4
What is the main idea of the passage?
The answer is B: An international project rebuilt Abu Simbel above a new reservoir, which also displaced Nubian communities.
The passage explains the reservoir’s human cost as well as the block-by-block temple rescue and cooperation.
-
Question 2 of 4
Why was each stone block marked?
The answer is C: So workers could rebuild it in the correct position.
Marking preserved the placement information needed after cutting the structure apart.
-
Question 3 of 4
What does “reservoir” mean?
The answer is D: a large stored body of water
The dam’s reservoir would cover the old site with water.
-
Question 4 of 4
When was the relocation work completed?
The answer is A: 1968
The third paragraph gives 1968 as the completion year.
Score: none answered yet.